Home
My Geoworks
Sneddon Law wind farm haul road

30,000 homes powered cleanly after Geoworks intervention

  • Community Wind Power

  • Sneddon Law Windfarm

  • 15 wind turbines

  • 30,000 homes

  • 50,000 tonnes of CO2 displaced

  • SX Grid

The Sneddon Law Community Wind Farm in East Ayrshire, Scotland is set to deliver 15 wind turbines – each 130 metres tall from bottom to tip. However, before the project could get underway, we were brought in to help lay the groundwork.

With a combined output of 30 megawatts, the 15 turbines will be a huge help to the area, able to power nearly 30,000 homes and displace more than 50,000 tonnes of carbon dioxide per year.

Having been approved in 2014, the project was already a long time into development when we were brought on to provide a solution. At this stage, it was crucial that the project was not further delayed because of poor ground conditions, when so close to finish.

We were brought in by Community Wind Power, the project developers leading the project, to design and supply SX3030 geogrid and our MultiTrack nonwoven geotextile, chosen for their superior performance and availability.

Campbell Duncan of Duncan Plant said: “We had used Geoworks's products on a previous scheme and were very impressed with the final results. For this project, the solution required some redesigning to help them better complete their purpose and work better with our own materials. However, Geoworks was very accommodating in helping us through this design process and testing each iteration.

“Ultimately, we were very impressed again with the finished products and Geoworks itself. Because of Geoworks the Sneddon Law Community Wind Farm is closer to completion, and closer to supporting the local area with clean, renewable power.”

Sneddon Law Wind farm

Gallery

We were very impressed with the finished products and Geoworks itself. Because of Geoworks the Sneddon Law Community Wind Farm is closer to completion and closer to supporting the local area with clean, renewable power

Campbell Duncan

Duncan Plant

Shahid Raza, technical sales manager at Geoworks, said: “These turbines will be a great boost to the area, and we’re proud to have played a part in their development. Additionally, the different designs, tests, and iterations we developed to solve this issue illustrates our ability to adapt our products to specific needs. Two layers of geogrid and one layer of geotextile later, the site now has the sturdy ground it needs.”

Related case studies

Related case study

Warner Brothers Studio

We helped Warner Brothers Studio and earthworks contractor Spadeoak to build new car parking areas as the land where they had previously built car parking on was being reclaimed for new buildings. Our MultiTrack 1000 nonwoven geotextile was laid on the formation to provide separation and filtration.

Warner Brothers Studio
Warner Brothers Studio
Read more
Related case study

Cumnock SWS Power Line Upgrade

The Scottish Government has set a major target to generate Scotland’s electricity from renewable energy. As the existing network does not have sufficient capacity to cope with the level of demand, a new transmission network was required. The South West Scotland Connections Project will play a key role in helping Scotland meet its renewable energy goals.

South West Scotland Connections
South West Scotland Connections
Read more