Fallow Park is an exclusive housing development on the outskirts of Cannock. The rural setting of the development and close proximity to Hawks Green Nature Reserve influenced the design and installation of shared recreation areas on the site.

A 1,400m2 ornamental pond with green space was designed to enhance the development and provide a habitat for a variety of wildlife.The ground conditions and nature of the finished pond meant that an impermeable membrane would be required to line the pond.

The groundwork contractors contacted Geowkrs via their preferred distributor to provide a solution. Typically in this situation a specialist team of geomembrane installers would visit the site, place the geomembrane and weld the joints to provide a water tight seal.

However, our geosynthetics team offered a one-piece Greenseal EDPM Geomembrane as the solution, meeting the requirements of the specification whilst providing huge cost savings in installation timescales, plus the material did not require specialist installation machinery.

The liner was protected by our 300g/m2 MultiTrack SNW geotextile protection fleece. The liner was pre-fabricated by our geomembrane partner and delivered to site on a manageable roll for the groundworkers to install. Both the geotextile and liner were installed within 2 hours of commencement as the liner was simply unfurled from its roll and placed in-situ.

The end results speak for itself and an established ornamental pond is now in place, supporting a wide range of biodiversity and increasing the aesthetic appeal of the development.

FasTrack

Geoworks provided Jessup’s with a technical solution which saved time and cost, enabling us to continue with our works unhindered ensuring we met key milestones of the construction phase. Their on-site technical support was invaluable during the installation of the geomembrane.

Paul Holyhead

Jessup Brothers Limited

Gallery

Related case studies

Case study

Mostyn Sea Wall Repairs

When gale force winds combined with high tides on Thursday 5th December 2013, the result was the worst storm surge to hit North Wales in years. A solution devised jointly by Atkins, Alun Griffiths (Contractors) Limited and Geoworks was agreed. Our geosynthetic products were used to aid the creation of a barrier against adverse weather.

Network Rail Wales
Network Rail Wales
Read more
Related case study

Old Colwyn Embankment Repairs

We were approached by Alun Griffiths (Contractors) Limited, and Atkins to advise on a suitable geotextile to go beneath rock armour as a heavy-duty separation and filtration layer. The geotextile would form part of the necessary repair work to Network Rail Wales’ embankment at Old Colwyn, Conwy. The project is one of a series of schemes along the North Wales coastline where we have supplied their Multitrack geotextile to Alun Griffiths (Contractors) Limited.

Network Rail Wales
Network Rail Wales
Read more