Home
My Geoworks
Geosynthetic being installed on construction site

Geogrid transportation, storage and installation guide

Introduction

The following information is offered in good faith to assist end users with the transportation, storage and installation of our Geogrid products. As installation damage is one of the key factors that affect the integrity of the installed product it is recommended that the following guideline be adhered to as closely as possible

Safety and handling

Geogrid products are manufactured from Polypropylene and High-Density Polyethylene, both of which are non-hazardous to health. Special precautions are therefore not necessary. Should the products be involved in a fire, care should be taken not to handle hot or molten material or inhale smoke. For handling the material it is recommended that protective gloves are worn to avoid any cuts or abrasions as the mesh can be quite sharp, particularly at cut edges. Take care when walking on the product as it can be slippery when wet.

Storage

The product should be stacked safely in a secure location on firm ground until ready to use. The rolls may be parallel or cross-stacked up to 5 rolls high. Stacks must be adequately chocked to prevent collapse. Products may be stored un-covered out-of-doors during normal construction periods of a few weeks. Extended storage, e.g. of excess material between projects, should be covered or indoors.

Transportation

Depending on local regulations concerning manual lifting, rolls of the product may be transported on-site by hand or machine. For manual transport, good lifting practices and local regulations must be followed. For machine transport, rolls may be carried carefully across the forks of a forklift truck or by means of round ‘carpet boom’ inserted in the central core hole of the roll. Conventional flat forks must not be inserted into the central core holes of rolls of product.

Subgrade preparation

It is possible to lay the geogrid directly on undisturbed vegetation e.g. grasses and reeds should levels permit. Any woody plant vegetation such as bushes or shrubs, as well as large rocks or other similar obstacles, must first be removed. On very soft ground it can be advantageous to cut vegetation flush with the ground to leave the root zone and soil crust undisturbed. All voids, wheel ruts or other deep depressions require to be either filled or levelled to provide a smooth surface.

Product installation

The geogrid should be rolled out and allowed to follow the contours of the ground. Generally, the direction of the laying will be specified in the contract or design documents. If the direction is not specified then different considerations apply to the use of Biaxial and Uniaxial geogrids. Biaxial may be placed on the subgrade either parallel to a road centre line or at right angles to it.

Uniaxial geogrids should generally be placed at right angles to the line of the face of the wall or slope being reinforced by them. All geogrids should be tensioned by hand to remove slack and to ensure that any mechanical joints are taught.

Small deposits of fill material will generally be required on top of the geogrid at this time to hold it in position until the main fill placement commences. No construction traffic may be allowed to travel directly on the geogrid prior to fill placement.

Geotextile / Geogrid combinations

Should the joint use of a geotextile separator and geogrid be specified over very soft ground then the geogrid should always be placed on top of the geotextile.

Product continuity

For Biaxial geogrids, the simplest and quickest method of ensuring product continuity is to overlap adjacent layers. Roll edges and ends should have a minimum overlap of 300mm. Over soft or uneven soil, these overlaps may require to be increased up to as much as 600mm.

Care should be taken to ensure that the overlaps are maintained during the fill placement. Should a mechanical joint be required then please consult the manufacturer for further details.

Uniaxial geogrids may be joined end-to-end by the use of ‘bodkin’ joints. Bodkins of the appropriate size, shape and material supplied by the manufacturer should be used.

Cutting to size

Product may be cut to length or width using either snips or a disc cutter.

Placement of cover fill

Fill material should be end tipped at either the starting edge of the geogrid or on top of the already placed fill before being spread to the required depth using a tracked machine. A minimum fill layer thickness over geogrid of 150mm is recommended prior to any trafficking or compaction.

Fill selection

A selection of fill types may be used with geogrid products. Ideally, the use of a graded aggregate is recommended, with Type 1 or Type 2 sub-base (as per the UK Highways Agency’s Specification for Highway Works) being the preferred material.

Fill compaction

Compaction of the sub-base material should follow in accordance with the appropriate clause of the project specification.

Related pages

Related products

Stock code Description My Geoworks
GGC/COMBSX30/5.2X50 SX Composite 3030 composed of a thermally bonded SX Geogrid and Geotextile - 5.2m x 50m roll
GGEGRID/30 E'GRID 3030 Premium Biaxial Geogrid Polypropylene - 4m x 50m roll
GGEGRID/30L E'GRID 3030L Premium Biaxial Geogrid Polypropylene, large aperture - 4m x 50m roll
GGEGRID/40 E'GRID 4040 Premium Biaxial Geogrid Polypropylene - 4m x 30m roll
GGEGRID/50R/1.3X50 E'GRID Uniaxial Geogrid HDPE - 1.3m x 50m roll
GGEGRID/60R/1.3X50 E'GRID Uniaxial Geogrid HDPE - 1.3m x 50m roll
GGEGRID/70R/1.3X50 E'GRID Uniaxial Geogrid HDPE - 1.3m x 50m roll
GGEGRID/95R/1.3X50 E'GRID Uniaxial Geogrid HDPE - 1.3m x 50m roll
GGSXGRID/20 SX Grid Biaxial Geogrid Polypropylene - 5.2m x 50m roll
GGSXGRID/30 SX Grid Biaxial Geogrid Polypropylene - 5.2m x 50m roll