Home
My Geoworks

£2.5M logistics project propped up with Geoworks geosynthetics

30,000 homes powered cleanly after Geoworks intervention

Coming through in a pinch, Loft Lines Belfast

Norwich North Recycling Centre

Providing the answer to access issues at Scottish Wind Farm

Supporting the Scottish National Gallery Revamp

Longhill burn Wind Farm

Ground reinforcement for Code Fitness Gym

Helping to keep busy Suffolk road moving

Value Engineered Road for Oak Grange housing development

Hinkley Point C Nuclear Power Station haul road

Whittington Rifle Ranges

Ornamental Pond at Fallow Park

Old Colwyn Embankment Repairs

Earl Shilton Treatment Works

Colchester Cemetery and Crematorium

Warner Brothers Studio

The Kinema in the Woods

Cumnock SWS Power Line Upgrade

Belton House Overspill Car Park

Thetford Woodland Lodges

Chelsea Garden Project

Bristol Airport, Silverzone Car Park

Great Yarmouth Outer Harbour

Helping Alan Titchmarsh to ‘Love Your Garden’

Mostyn Sea Wall Repairs

Related case study

Helping to keep busy Suffolk road moving

Our technical team was contacted in August 2020 by contractor Interserve (now Tilbury Douglas), which made the improvements on behalf of Suffolk County Council, after the groundworker needed assistance mitigating issues caused by soft ground in the sub-formation near where the link road was being constructed – bringing the project to a halt.

Suffolk County Council
Suffolk County Council
Read more
Related case study

Value Engineered Road for Oak Grange housing development

Our geogrids team value-engineered a fit-for-purpose adoptable road for a new Derby housing development, working with the city council, William Davis Homes and S&L Groundworks. This project demonstrates how value engineering solutions such as geogrids can be used to solve general and site-specific issues for the housing sector.

William Davis Homes
William Davis Homes
Read more
Related case study

Hinkley Point C Nuclear Power Station haul road

Working with J. Murphy & Sons and Balfour Beatty we helped with the construction of a ten-kilometre haul road to support the first UK nuclear power station to be built in over 20 years. When complete, Hinkley Point C in Somerset will provide low-carbon electricity for around six million homes across the South West.

EDF Energy
EDF Energy
Read more
Case study

Whittington Rifle Ranges

The existing stop butts at Whittington Ranges had not been used for many years and had fallen into a state of disrepair. Our client was tasked with reinstating the stop butts and bringing them up to current safety standards so that the range could be re-opened for use by the armed forces.

Landmarc
Landmarc
Read more
Related case study

Ornamental Pond at Fallow Park

Fallow Park is an exclusive housing development on the outskirts of Cannock. A 1400m2 ornamental pond with green space was designed to enhance the development and provide a habitat for a variety of wildlife. The ground conditions and nature of the finished pond meant that an impermeable membrane would be required to line the pond.

Jessup Brothers
Jessup Brothers
Read more
Related case study

Old Colwyn Embankment Repairs

We were approached by Alun Griffiths (Contractors) Limited, and Atkins to advise on a suitable geotextile to go beneath rock armour as a heavy-duty separation and filtration layer. The geotextile would form part of the necessary repair work to Network Rail Wales’ embankment at Old Colwyn, Conwy. The project is one of a series of schemes along the North Wales coastline where we have supplied their Multitrack geotextile to Alun Griffiths (Contractors) Limited.

Network Rail Wales
Network Rail Wales
Read more
Case study

Earl Shilton Treatment Works

​​​​​​We were approached by Severn Trent’s contractor to discuss the creation of site access and a proposed working platform to be installed at the sewage treatment works at Earl Shilton, southwest of Leicester. The proposed plant for the site works required temporary works access as well as a working platform for the concrete pump and hydraulic (Kobelco CKE700) crawler crane.

Severn Trent
Severn Trent
Read more
Case study

Colchester Cemetery and Crematorium

When Colchester Cemetery and Crematorium needed to increase the space visitors had to park their cars, its options were limited. The only potential area it identified was within a copse of established oak and maple trees. The use of ProtectaWeb for this project enabled it to go ahead with minimal tree felling and maximum land use.

Colchester Borough Council
Colchester Borough Council
Read more