Home
My Geoworks

Driving out the competition with a winning car park surface specification

11Arches visitor car park made easier with Ecodeck

Thetford Woodland Lodges

£2.5M logistics project propped up with Geoworks geosynthetics

30,000 homes powered cleanly after Geoworks intervention

Coming through in a pinch, Loft Lines Belfast

Norwich North Recycling Centre

Providing the answer to access issues at Scottish Wind Farm

Supporting the Scottish National Gallery Revamp

Longhill burn Wind Farm

Ground reinforcement for Code Fitness Gym

Helping to keep busy Suffolk road moving

Value Engineered Road for Oak Grange housing development

Hinkley Point C Nuclear Power Station haul road

Whittington Rifle Ranges

Ornamental Pond at Fallow Park

Old Colwyn Embankment Repairs

Earl Shilton Treatment Works

Colchester Cemetery and Crematorium

Warner Brothers Studio

The Kinema in the Woods

Cumnock SWS Power Line Upgrade

Belton House Overspill Car Park

Chelsea Garden Project

Bristol Airport, Silverzone Car Park

Great Yarmouth Outer Harbour

Helping Alan Titchmarsh to ‘Love Your Garden’

Mostyn Sea Wall Repairs

Related case study

Supporting the Scottish National Gallery Revamp

The Scottish National Gallery in Edinburgh has been home to a hugely prestigious, multi-million-pound transformation project, Wrekin provided solutions to provide top soil erosion control.

AHF Construction Management
AHF Construction Management
Read more
Related case study

Longhill burn Wind Farm

A new multi-million-pound wind farm is currently being constructed in West Lothian and, upon completion in 2022, it will be one of the largest onshore farms in the UK. Work at Longhill Burn wind farm in West Calder started in April 2021, with operations and management delivered by leading wind farm business, Energiekontor UK.  

A E Yates
A E Yates
Read more
Related case study

Ground reinforcement for Code Fitness Gym

After encountering ground problems during the construction of a new gym on a countryside business park, Caliber Construction knew who to contact. However, contacting us after works had begun meant the need to provide a time effective solution was critical.

Code Fitness Gym
Code Fitness Gym
Read more
Related case study

Helping to keep busy Suffolk road moving

Our technical team was contacted in August 2020 by contractor Interserve (now Tilbury Douglas), which made the improvements on behalf of Suffolk County Council, after the groundworker needed assistance mitigating issues caused by soft ground in the sub-formation near where the link road was being constructed – bringing the project to a halt.

Suffolk County Council
Suffolk County Council
Read more
Related case study

Value Engineered Road for Oak Grange housing development

Our geogrids team value-engineered a fit-for-purpose adoptable road for a new Derby housing development, working with the city council, William Davis Homes and S&L Groundworks. This project demonstrates how value engineering solutions such as geogrids can be used to solve general and site-specific issues for the housing sector.

William Davis Homes
William Davis Homes
Read more
Related case study

Hinkley Point C Nuclear Power Station haul road

Working with J. Murphy & Sons and Balfour Beatty we helped with the construction of a ten-kilometre haul road to support the first UK nuclear power station to be built in over 20 years. When complete, Hinkley Point C in Somerset will provide low-carbon electricity for around six million homes across the South West.

EDF Energy
EDF Energy
Read more
Related case study

Whittington Rifle Ranges

The existing stop butts at Whittington Ranges had not been used for many years and had fallen into a state of disrepair. Our client was tasked with reinstating the stop butts and bringing them up to current safety standards so that the range could be re-opened for use by the armed forces.

Landmarc
Landmarc
Read more
Related case study

Ornamental Pond at Fallow Park

Fallow Park is an exclusive housing development on the outskirts of Cannock. A 1400m2 ornamental pond with green space was designed to enhance the development and provide a habitat for a variety of wildlife. The ground conditions and nature of the finished pond meant that an impermeable membrane would be required to line the pond.

Jessup Brothers
Jessup Brothers
Read more